On a coupled line, only one machine actually stopped.

A jam at the palletiser stops the labeller, which starves the filler. Three machines record a stop and one of them caused it. VZIAM MES keeps that difference: each stop is timed by its own controller and qualified as the machine’s own or induced by another, so the work goes to where the cause is.

Everything on the line reports downtime, and none of it says which.

High-speed packaging fails in ways that are individually trivial and collectively expensive.

Cascades counted three times

When a stop propagates, every machine on the line logs one. The Pareto then ranks the machines that suffered rather than the one that caused it, and maintenance is sent to the wrong end of the line, repeatedly, because the ranking keeps saying the same thing.

Short stops below the threshold

A thirty-second jam cleared by the operator standing next to it is not usually declared. Across a shift on a fast line those clearances add up, and they are a category of loss that nobody has a figure for.

Changeovers timed from memory

Format changes are recorded, if at all, as a duration somebody estimated afterwards. Whether one team is genuinely quicker than another is therefore a matter of opinion, and it gets settled the way opinions do.

Time every machine, then say which stops were its own.

The order the machines stopped in is a fact the controllers already hold. Each step is a part of VZIAM MES, and its page is linked under it.

  1. 01

    Time each machine from its own controller

    Every machine on the line has its own timeline, with no gaps and no overlaps, timed from its controller’s state changes. Which machine stopped first is then a matter of timestamps, not of who reached the radio first.

    How machine data is read
  2. 02

    Qualify a stop as own or induced

    Each stop reason is typed under AFNOR NF E60-182, and induced is one of the types: a filler starved by the labeller is waiting, not broken. Because the type travels with the reason, the losses a machine caused are kept apart from the ones it suffered.

    Telling cause from consequence on a coupled line
  3. 03

    Count the jams nobody declares

    An unexplained stop under the threshold set for that machine is counted as a micro-stop, against performance, without asking anyone for a reason. The count is complete, which it never is when it depends on someone choosing to log it.

    Micro-stops, counted
  4. 04

    Time format changes from the machine

    A format change is a stop timed by the controller, qualified with its reason and compared with the target set for it. The cockpit shows the overrun as it happens, and comparing one changeover with another needs nobody on the line with a clipboard.

    How a stop is timed and qualified

Four people, one account of the line.

The operator, maintenance, the supervisor and the production manager read the same stops, each with the machine that had it and the type its reason gave it.

The machine times the stop, the operator says why.

Each machine’s timeline comes from its own controller. The operator is asked only for the reason, from the list set for that machine, and an induced reason says the stop came from elsewhere.

How a stop is timed and qualified
Machine timelineA shift on the palletiser.
Start and end
From the controller
Reason
From the operator
Type
Own or induced

What gets connected on a packaging line.

Each machine
Its own timeline
Controllers
OPC UA, MQTT, HTTP push
Older machines
Modbus, S7, via a gateway
Stop types
Closure, planned, induced, own, micro
Micro-stop threshold
Per machine
Changeover
Planned or not, with a target
Line display
Any browser on a TV

Frequently asked questions.

Tell us which machine your team thinks is the constraint, and ask the engineers how the record would confirm it.

Book a call

No. It times every machine from its own controller, so the order in which they stopped is on the record, and the operator qualifies each stop with a reason typed own or induced. The cause comes from those two facts together, not from an inference the software makes on its own.

Plan the change before it reaches the line.

Request a demo and an engineer looks at how your production runs today, shows how the software would fit around it, and where a pilot on one line would start.

How the demo works
  1. 01Pick a time

    Choose a slot in the calendar, and note what you make and what reads your machines today.

  2. 02Screen shared with an engineer

    A video call with someone who builds the software, in English or French.

  3. 03What would connect

    For each machine, its path: native (OPC UA, MQTT or HTTP push), through a gateway, or nothing to build.